By

Cullis, James DÌý1

1ÌýCivil Environmental and Architectural Engineering (CEAE) and Institute for Arctic and Alpine Research (INSTAAR)

Didymosphenia geminataÌý(didymo) was introduced into a New Zealand river in 2004, and since then has dramatically spread to cover the beds of many rivers with extremely dense and extensive mats. Successful management is hampered by the fact that much is still unknown about the factors affecting the growth of this nuisance species.

We synthesized available data on the distribution of didymo in New Zealand rivers to determine how physical and chemical system conditions (flow, bed disturbance, nutrients, and light) affect the growth and persistence of this organism. Here we assess results from bi-weekly surveys performed over a full year on two rivers where didymo was first observed in New Zealand; the Oreti and Mararoa. We used the data to test the hypotheses that the development of thick, dense mats requires high light levels but is inversely proportional to nutrient levels, and that mat persistence is controlled by the frequency of flow events that produce bed sediment transport.

Observed regrowth between disturbance events was found to be inversely correlated with nutrient availability. The seasonal availability of light did not correlate with variations in growth rate, but this did not account for specific characteristics of the different sites such as aspect, shading, flow depth and turbidity that will all impact on the amount of available light reaching the streambed. The results clearly indicate that the time-history of flow and nutrient levels is critical to evaluating the growth and persistence of didymo and that additional site specific information is necessary to determine the role of bed stability and the amount of available light reaching the streambed.